📐 Engineering Standards Used

  • Concrete dry factor = 1.54
  • Plaster dry factor = 1.6
  • Brickwork mortar = 30%
  • Brickwork dry factor = 1.33
  • 1 cement bag = 0.0347 m³
  • 1 m³ = 35.32 cft
  • 1 sqm = 10.76 sft